What CHAS asks a contractor for
The full list, in plain words, from CHAS's own published criteria. See what RAMS AI keeps and writes for you, and what's yours to hand in.
We get your paperwork ready. The scheme assesses you.
CHAS Standard
The SSIP safety assessment, with your insurance.
CHAS Standard asks for 21 things. RAMS AI keeps or writes 15 of them for you as you work.
Kept for you as you work (14)
- Health and safety policy, signed within the last 12 months
- Signed by the person at the top, saying who is responsible for what. Reviewed every year.
- How the firm manages safety: the arrangements
- Inside the policy: risk assessment, training, COSHH, PPE, first aid, accidents, fire and the rest.
- Drugs and alcohol
- A section of the health and safety policy.
- Competent health and safety advice
- Who the firm goes to, named in the policy.
- Training, toolbox talks and inductions, with records
- The talks given and the inductions done, each with who signed.
- Site checks, and what changed after them
- Walk-rounds on jobs, and the policy's yearly review.
- Talking to the workforce about safety
- Toolbox talks, and the policy's section on it.
- Accident and near-miss records
- Incident reports, and the policy's section on RIDDOR. Schemes ask for three years' figures.
- Checking the subcontractors you bring in
- The policy says how they are checked; their cards on file show it was done.
- Risk assessments and method statements from the last 12 months
- Site-specific RAMS, signed off on real jobs.
- COSHH assessments
- Only if the firm uses something that could harm health: one for each substance.
- Working with the principal contractor and other trades
- Handover records with the site manager's Seen on them.
- Welfare on site
- A section of the health and safety policy (CDM Schedule 2).
- A construction phase plan where the firm is the only contractor
- Only for jobs done direct for a client.
Written for you from a few answers (1)
- Your duties under CDM 2015
- Which role the firm takes and how it meets it: the CDM section of the health and safety policy.
Yours to supply: snap it once, and we remind you before it runs out (6)
- Everyone's cards and tickets, in date
- CSCS and trade cards on file for each person, with their end dates.
- Enforcement action in the last five years
- You declare it on the scheme's own form: any HSE notices or prosecutions.
- Plant and kit with inspection records
- The kit list, with each item's last inspection and the next due.
- Employers' liability insurance
- £5 million minimum, the law if the firm employs anyone. The certificate, with its end date.
- Public liability insurance
- The certificate, with its end date. Every scheme asks.
- Professional indemnity insurance
- Only if the firm designs. Most subcontractors don't need it.
Checked against CHAS's published criteria and the SSIP core criteria on 15 Sep 2026.
CHAS Advanced
SSIP plus the business modules: environmental, quality, financial standing, equality, modern slavery.
CHAS Advanced asks for 31 things. RAMS AI keeps or writes 21 of them for you as you work.
Checked against CHAS's published criteria and the SSIP core criteria on 15 Sep 2026.
CHAS Elite
The Common Assessment Standard: the lot, in Build UK's order.
CHAS Elite asks for 31 things. RAMS AI keeps or writes 21 of them for you as you work.
Checked against CHAS's published criteria, the SSIP core criteria and the Common Assessment Standard on 15 Sep 2026.
The sources
- CHAS: How to become a CHAS member (Standard, Advanced, Elite) (15 Sep 2026)
- CHAS: Contractor health and safety assessment (15 Sep 2026)
- CHAS: Common Assessment Standard (the 13 areas) (15 Sep 2026)
- SSIP Core Criteria (4 Sep 2026)
- Build UK, Common Assessment Standard Question Set, version 5 (1 Jul 2025)
Get your CHAS paperwork ready
Sign up free. No card. Your first 30 days include Getting approved, which builds your list and your pack.
Not sure how close you are?
Fifteen quick questions and you'll see your score, and what's missing. Check how ready you are.