Passive Fire Protection RAMS – AI Risk Assessments for PFP Installers
AI-generated Passive Fire Protection RAMS for UK PFP contractors. Intumescent seals, fire stopping, fire dampers, cavity barriers, fire door installation, and compartmentation surveys. ASFP, BS 9999:2017, and Approved Document B aligned.
Operations Covered
- Intumescent pipe collar and sleeve installation around service penetrations
- Linear joint seals and service penetration fire stopping
- Fire damper installation and commissioning in ductwork
- Cavity barrier installation in wall and ceiling voids
- Fire door installation, fitting, and certification
- Compartmentation survey and remediation works
- Ablative, board-based, and spray-applied fire stopping systems
Key Hazards Addressed
- Working in occupied buildings – public interface, access control, and noise management
- Dust from drilling and cutting – silica dust, fibrous insulation materials, RPE requirements
- Chemical exposures – intumescent compounds, sealants, and adhesives (COSHH assessment)
- Working at height – internal ladders, hop-ups, and access towers for ceiling void work
- Fire damper inspection in ductwork – confined space assessment where applicable
- Fire door handling – heavy door sets, ironmongery adjustment, and testing
Regulatory Framework
- ASFP (Association for Specialist Fire Protection) technical guidance
- BS 9999:2017 – Fire safety in the design, management and use of buildings
- Approved Document B – Fire Safety (Building Regulations 2010)
- BS EN 1366-3 – Fire resistance tests for service installations
- CDM 2015 – Construction (Design and Management) Regulations