Passive Fire Protection RAMS – AI Risk Assessments for PFP Installers

AI-generated Passive Fire Protection RAMS for UK PFP contractors. Intumescent seals, fire stopping, fire dampers, cavity barriers, fire door installation, and compartmentation surveys. ASFP, BS 9999:2017, and Approved Document B aligned.

Operations Covered

  • Intumescent pipe collar and sleeve installation around service penetrations
  • Linear joint seals and service penetration fire stopping
  • Fire damper installation and commissioning in ductwork
  • Cavity barrier installation in wall and ceiling voids
  • Fire door installation, fitting, and certification
  • Compartmentation survey and remediation works
  • Ablative, board-based, and spray-applied fire stopping systems

Key Hazards Addressed

  • Working in occupied buildings – public interface, access control, and noise management
  • Dust from drilling and cutting – silica dust, fibrous insulation materials, RPE requirements
  • Chemical exposures – intumescent compounds, sealants, and adhesives (COSHH assessment)
  • Working at height – internal ladders, hop-ups, and access towers for ceiling void work
  • Fire damper inspection in ductwork – confined space assessment where applicable
  • Fire door handling – heavy door sets, ironmongery adjustment, and testing

Regulatory Framework

  • ASFP (Association for Specialist Fire Protection) technical guidance
  • BS 9999:2017 – Fire safety in the design, management and use of buildings
  • Approved Document B – Fire Safety (Building Regulations 2010)
  • BS EN 1366-3 – Fire resistance tests for service installations
  • CDM 2015 – Construction (Design and Management) Regulations

Start generating PFP RAMS free | View plans | RAMS Generator