How often should a risk assessment be reviewed? Not 'annually', here’s when
By Simon Winson
Stop waiting for the anniversary. UK law sets review triggers, not a calendar. I’ll show you exactly when to review a risk assessment under MHSWR 1999 reg 3(3), why an old ‘reviewed annually’ stamp is a red flag to inspectors, and the practical trigger list I expect small contractors to use on real...
If you are asking how often should a risk assessment be reviewed, the law does not say “annually”. Under the Management of Health and Safety at Work Regulations 1999 reg 3(3), you must review it when it is no longer valid, after any significant change, and after an accident, incident or near miss. In practice, that means on change of method, plant, people, environment or information, and after any event that shows the controls are not working.
What the law actually says about reviews
I see the same line on RAMS every week, reviewed annually. It sounds tidy. It is also the wrong test. The law sets triggers, not a timetable. The Management of Health and Safety at Work Regulations 1999 reg 3(3) say you must review your risk assessment if it is no longer valid, if there has been a significant change, or after an accident, incident or near miss. That is it. No anniversary, no 12 months, no January admin day.
Think about how we actually work. One week you are drilling the slab with a small SDS and a vac. The next you have a 110 mm core bit and water feed, in a tight riser with live services passing. Same headline task, completely different risk profile. If you rely on a one year clock, you will miss the point when the assessment stops matching the job in front of you.
Review is not re-write every time. It is a check that the hazards and controls in the assessment still reflect the reality of the task and site. If they do, a simple note of review is enough. If they do not, update the document, brief the team and record what changed. That is the habit of a competent contractor, not a box ticked once a year.
If you want the wider context, read Is a risk assessment a legal requirement? What the law actually says before you tighten up your review process.
Why that ‘reviewed annually’ stamp gets you marked down
When I pick up a RAMS pack and see Reviewed annually on a document last edited in 2019, I start looking harder. Inspectors do the same. It tells us no one has thought about change since pre-pandemic work patterns, different suppliers, new kit and updated guidance. On site, that shows as controls that do not quite fit, or heads down while someone makes it up on the day.
I still remember a wet Tuesday, ground full of standing water, wind cutting through. The method said lifting 100 kg units with a genie lift, but the slab edge was now fenced for a public walkway and the genie would not reach. The assessment had a tidy annual review stamp, but no one had looked again after the site layout changed. The lads ended up manhandling and got lucky. That stamp did not help them.
An old date also shouts, this is a library document. You can smell it the way you can smell cut cement board hanging in the air. If it has generic hazards and no site detail, and it has the same review line year after year, it is not controlling risk. It is a comfort blanket. Review on triggers, write what you are actually doing, and the whole job runs straighter.
For structure and content, keep a copy of What should a RAMS include? Full Checklist next to your master template.
A practical trigger list for small firms
Here is what I expect to see driving reviews on a small contracting job. Changes in method or sequence, for example moving from fix from the slab to fix from a MEWP, swapping resin anchors for through-bolts, or using a different cutting technique. New plant or equipment, such as moving from a 2.4 m podium to a 5.8 m tower, or changing to a heavier hoist. New substances or different products, fresh SDS sheets, a new adhesive with a different exposure limit or a two-part resin with isocyanates.
People and competence changes also count. A different gang, agency workers for a week, a new supervisor, or a trainee added to the team. Environment and site layout changes matter, for example scaffold tied at different points, a part-loaded transom where the hop-up was planned, a change in temporary works, or winter lighting that turns a safe walkway into a trip zone. Weather extremes need a look too, like high winds for cladding or lightning when using long aluminium sections outside.
Events are obvious triggers. Any accident, incident or near miss means you check whether the controls worked and whether more is needed, which lines up with MHSWR 1999 reg 3(3). Repeated dynamic risk assessment decisions are another clue. If your supervisor keeps making the same on-the-day adjustment, fold that learning into the written assessment. And when external rules shift, for example a client introduces a permit to work on a task, or current NASC guidance updates a control on scaffold work, review and adjust.
If any terminology in this article is unclear, the UK Construction Safety Glossary – RAMS, CDM, COSHH will help translate it into plain site language.
What review looks like on real jobs
Groundworks first. Day one, excavation near existing services, CAT and Genny used, permit in place, banksman briefed. Day two, the client adds a welfare unit and the access road is now a pedestrian route at lunch. Your travel path for the mini digger overlaps. That is a review moment. You may add a banksman for movements, change the exclusion zone and re-brief. Wait for an annual date and you will be reading this in hospital.
Fit-out crews know the smell of cut cement board. One week you are using score and snap, the next the client wants tighter cuts around M&E and you switch to a saw with on-tool extraction indoors. New dust exposure route, new noise, new fire load from offcuts. Review the risk assessment, check your LEV and face fit, update the fire watch between cuts, and record the change. It is a 15 minute job that saves lungs and rows.
On roof work, the difference between a dry spell and gusting wind is not academic. If your method counted on sheeting staying put with a couple of fixings while you walk back to the stack, and the forecast moves, the assessment needs to reflect that, as expected by the Work at Height Regulations on planning and organising work at height. The fix is usually simple, more temporary fixings staged, different sequence, or postpone. The review note proves you planned, not guessed.
How to record reviews so they stand up
You do not need a glossy system to do this well. Put a version number on the risk assessment, add a review box with date, name, reason for review and a short summary of changes. Keep a change log at the back. If nothing changed, write reviewed, still valid for task and site. If something changed, list it, highlight the control, and make sure the briefing sheet matches. The last RAMS I rejected had three different versions floating around the site. Pick one master and bin the rest.
Briefing is part of the review. If you change the control, your team needs the update in plain words. I like a quick stand-up at the stack or by the hoist, point at the hazard in front of you, what has changed and who is doing what. Then a clean signature, no scribble. If agency lads are on, make the language simpler, not longer. The reviewer should be someone competent for the task, usually the supervisor on that work front.
Near misses deserve the same treatment as injuries, at least for the review step. If a slab edge trip almost sent a trolley over yesterday, put your boots there, ask what failed in the control, and write it up. If it is reportable under RIDDOR you will deal with that separately, but the immediate duty to review the assessment after an incident still sits with you under MHSWR 1999 reg 3(3). Do not wait for the client to ask.
Keeping it lean and current without drowning in paper
The best small firms I see keep a tidy master risk assessment per task, then add a short job sheet with site-specific details and any triggered reviews. You get 90 percent of the thinking carried over, but it still fits the real site. A common pattern is a two page assessment and a one page review note, with photos of the actual access, the actual plant and the actual route out.
Use your dynamic risk assessment to feed the formal one. If you keep writing, changed sequence due to crane delay, or swapped to A-frame carry on the day, and it happens more than once, make it part of the written method and the fixed controls. That is what inspectors want to see, learning landing back in the document, which lines up with the duty to review when the assessment is no longer valid under MHSWR 1999 reg 3(3).
Templates help if they are used with judgement. A blank box that forces you to add site detail is better than a shiny generic document with hazards you will never see. If you are not sure what a good RAMS looks like, read What should a RAMS include? Full Checklist and strip your documents back to what adds control and clarity.
Questions we get asked
Do I have to review a risk assessment for every single job?
No. You review when a trigger happens, not because a new job exists. If the task, method, plant, people and environment are genuinely the same, you can confirm the existing assessment is still valid and record that review. If any of those change, update it.
What counts as a significant change that triggers review?
A different method or sequence, new plant or tooling, new substance or data sheet, a change in site layout or access, different weather risk, or a change in who is doing the work or their competence. Any incident or near miss is also a trigger under MHSWR 1999 reg 3(3).
How do I prove I reviewed a risk assessment?
Add a review box with date, reviewer, reason and a short summary. Keep a simple change log. If controls changed, re-brief the team and get signatures. Photos of the changed setup help. One current version on site, with superseded copies removed.
How soon after a near miss should I review it?
Right away, while the job context is fresh. Under the Management of Health and Safety at Work Regulations 1999 reg 3(3), an incident or near miss is a review trigger. Do the review, adjust controls, and brief the team before work restarts.
Our RAMS say ‘reviewed annually’ because the client asked for it. Is that wrong?
It is not illegal to set a routine check, but it must not replace the legal triggers. Keep the calendar review if the client wants it, and still review whenever the assessment is no longer valid, when there is a significant change, or after an incident, as required by MHSWR 1999 reg 3(3).
The short version
Do not wait for an anniversary. UK law sets review triggers for risk assessments, not a timetable. Under MHSWR 1999 reg 3(3), review when it is no longer valid, after significant change, and after an accident, incident or near miss.
Use practical triggers, method change, plant, people, environment or events. Record reviews with a version, date, reason and a short note. Keep one current version on site and brief changes properly. That is how you keep RAMS alive and useful on real jobs.
If you need this written up properly for a real job, the paperwork is the easy part now.
Build a site-specific RAMS with RAMS AIWritten by the RAMS AI team at United Applications Ltd. Our content is informed by over 30 years of construction industry experience and reviewed for alignment with current UK health and safety legislation including the CDM 2015 Regulations and HSE guidance.