Principal Contractor RAMS Review Checklist

This checklist is designed for principal contractors, site managers, and project coordinators who review subcontractor RAMS before approving site access. It covers the categories commonly checked when assessing whether a RAMS document is acceptable under CDM 2015 — or should be returned for revision.

How to Use This Checklist

Work through each category in order. A RAMS that fails any mandatory check should be returned to the subcontractor with specific feedback before the subcontractor starts work. Do not accept a RAMS with generic scope, identical pre/post risk scores, or missing emergency arrangements regardless of programme pressure.

Checklist Categories

  1. Document completeness — Document reference, version number, date prepared, site name, and principal contractor name all present
  2. Scope specificity — Scope describes this specific task at this specific site; not a generic trade description
  3. Hazard register — Pre-control and post-control risk scores present and different; controls are actionable, not just “follow safe working practice”
  4. Method statement sequence — Sequence is chronological from mobilisation to demobilisation; gaps or jumps in logic are a red flag
  5. PPE — PPE listed matches the hazards; not just “PPE to be worn at all times”
  6. Plant and equipment — All plant listed with competence references (CPCS, IPAF, Gas Safe, etc.) where applicable
  7. COSHH — Substances relevant to the trade are referenced; COSHH assessment references included
  8. Emergency arrangements — Task-specific first aid provision, emergency contacts, and evacuation procedure — not just a phone number
  9. Briefing sign-off section — Space for operatives to sign before work starts; document has been or will be briefed
  10. Version history — Document shows version number and date; RAMS will be reissued and rebriefed if scope changes

Common Reasons to Return RAMS for Revision

  • Generic scope that does not name the site, location, or specific task
  • Pre-control and post-control risk scores identical — no evidence that controls were genuinely applied
  • Method statement too brief — lacks chronological detail or site-specific steps
  • Missing COSHH references for substances known to be used in that trade
  • Emergency section missing or limited to “call 999”