Scaffolding RAMS Template — Generate in Minutes

A scaffolding RAMS must cover the erection, alteration, and dismantling of scaffold structures — consistently among the highest-risk operations on construction sites. Falls from scaffolding, falling materials, and scaffold collapse account for a significant proportion of UK construction injuries.

Our generator produces a detailed scaffolding RAMS covering tube and fitting scaffolds, system scaffolds, mobile towers, and birdcage structures — with method statements aligned with NASC TG20 compliance and the Work at Height Regulations 2005.

What's Included in Your Scaffolding RAMS

  • Scaffold erection sequence and safe system of work
  • Working at height controls during erection, use, and dismantling
  • Scaffold inspection requirements (NASC TG20 and Regulation 12)
  • Foundation and base plate assessment for stability
  • Tie pattern calculations and anchorage requirements
  • Falling materials protection — brick guards, debris netting, toe boards
  • PPE including harnesses during erection, hard hats, and gloves
  • Exclusion zones and public protection

Scaffolding RAMS — Frequently Asked Questions

What qualifications are needed?
Scaffolders should hold CISRS cards appropriate to their role. Inspections must be by a competent person.
How often should scaffolding be inspected?
Before first use, after events affecting stability, and at intervals not exceeding 7 days.
Does the generator cover TG20?
Yes. It references NASC TG20:13 compliance sheets for standard configurations.
What hazards are unique to dismantling?
Damaged components, modified structures, shifted loads, and reverse-sequence fatigue.
Can I include public protection?
Yes. Covers pavement licences, pedestrian walkways, fans, crash decks, and hoarding.

Related Trade RAMS

Start generating your scaffolding RAMS free | RAMS Generator | View plans